QUANTITIES REQUIRED FOR CIVIL WORK
Brick work (CM 1:5) = 86 kg/10 m3
Brick work (CM 1:6) 9" thick = 80.64 kg/10 m3
Brick work (CM 1:3) 4 1/2" thick = 15.46 kg/10 m3
Plastering (CM 1:3) = 1.50 bags /10 m2
Plastering (CM 1:5) = 1.05 bags / 10 m2
Ceiling Plastering (CM 1:3) = 48 kg / 10 m2
Lime for white wash = 10 kg / 100 m2
Painting = 10 ltr / 100 m2
Distemper 1st coat = 6.5 kg / 100 m2
Distemper 2nd coat = 5.0 kg / 100 m2
Snowcem 1st coat = 30 kg / 100 m2
Snowcem 2nd coat = 20 kg / 100 m2
Paint ready mixed one coat = 10 ltr / 100 m2
Weathering coarse = 7.8 kg / 1 m2
Flooring = 8.1 kg / 1 m2
Labels:
Brick work,
Distemper,
Flooring,
Lime for white wash,
Painting,
Plastering,
QUANTITIES REQUIRED FOR CIVIL WORK,
Snowcem,
Weather coarse
Wednesday, 10 February 2021
UNIT WEIGHT OF MATERIAL USED IN CONSTRUCTION
MATERIAL | UNIT WEIGHT (Kg/m3) |
Cement | 1440 Kg/m3 |
P.C.C | 2400 Kg/m3 |
R.C.C | 2500 Kg/m3 |
Cement plaster | 2000 Kg/m3 |
Bitumen | 1340 Kg/m3 |
Water | 1000 Kg/m3 |