LATEST UPDATES
Showing posts with label Brick work. Show all posts
Showing posts with label Brick work. Show all posts

Tuesday, 23 February 2021

QUANTITIES REQUIRED FOR CIVIL WORK

 

Brick work, Flooring,

Brick work (CM 1:5) = 86 kg/10 m3

Brick work (CM 1:6) 9" thick = 80.64 kg/10 m3

Brick work (CM 1:3) 4 1/2" thick = 15.46 kg/10 m3

Plastering (CM 1:3) = 1.50 bags /10 m2

Plastering (CM 1:5)  = 1.05 bags / 10 m2

Ceiling Plastering (CM 1:3)  = 48 kg / 10 m2

Lime for white wash = 10 kg / 100 m2

Painting = 10 ltr / 100 m2

Distemper 1st coat = 6.5 kg / 100 m2

Distemper 2nd coat = 5.0 kg / 100 m2

Snowcem 1st coat = 30 kg / 100 m2

Snowcem 2nd coat = 20 kg / 100 m2

Paint ready mixed one coat = 10 ltr / 100 m2

Weathering coarse = 7.8 kg / 1 m2

Flooring = 8.1 kg / 1 m2

@2020 All Rights Reserved. Designed by WWW.SMARTWAYTOSTUDY.COM !!!! Sitemap !!!! Blogger Templates