PIPE LINE SPARES AND ITS PRICE

For pipe line materials like sluice valves, Spigot tail pieces,  C I D Joints, contact 

Mr: 

T S Haragopal

9849274647

(Rates on 11/10/2020)


Ductile iron sluice valves, soft seated, PN 16:

Ductile iron sluice valve
Credits : wikimedia.org/wikipedia/commons
50 mm - 2380/-

65 mm -2996/-

80 mm -. 3305/-

100 mm -. 4625/-

125 mm -. 6125/-

150 mm -.7315/-

200 mm -.12600/-

250 mm -.22562/-

300 mm -,35650/-

350 mm -.73416/-

GST : Extra

Prices: Ex - Vijayawada


C I Flange Spigot Tail pieces, 0.2 mtr Length:

100 mm - 621/-

125 mm -.864/-

150 mm -.1026/-

200 mm -. 1782/-

250 mm -.2475/-

300 mm -. 3190/-

350 mm -. 4032/-

Prices : Ex - Vijayawada

G S T : Extra


1. C I D Joints : Cl - 10, With bolts, nuts, rubber rings

——————————————————————————————————

100 mm -.282/-

125 mm -.359/-

150 mm -436/-

200 mm. - 667/-

250 mm - 870/-

300 mm - 1080/-

350 mm - 1828/-

 

2. C I D joints , Cl -15, With bolts, nuts, rubber rings

——————————————————————————————————

100 mm - 282/-

125 mm - 359/-

150 mm -.448/-

200 mm - 667/-

250 mm - 887/-

300 mm -.1109/-

350 mm - 1940/-

 

3. C I D joints, Cl -20, with bolts, nuts and rubber rings

——————————————————————————————————

100 mm - 288/-

125 mm  - 374/-

150 mm - 454/-

200 mm - 715/-

250 mm - 970/-

300 mm - 1240/-

350 mm - 2140/-

 

4. C I D joints, Cl - 25, with bolts, nuts and rubber rings:

——————————————————————————————————

100 mm - 294/-

125 mm - 385/-

150 mm - 478/-

200 mm - 739/-

250 mm - 1000/-

300 mm - 1280/-

350 mm - 2260/-

Prices: Ex - Vijayawada

G S T : Extra


T S Haragopal

9849274647

 

HDPE items:

FOR Destn

G S T : Extra @ 18 percent




PIPE LINE HDPE SPARES AND ITS PRICE

Monday, 5 October 2020

DEPARTMENTAL TESTS MAY-2020 SESSION : NOTIFICATION NO: 06/2020

DEPARTMENTAL TESTS NOTIFICATION MAY -2020 SESSION 


click the above link for notification Thank you.

DEPARTMENTAL TESTS NOTIFICATION MAY -2020, ANDHRAPRADESH PUBLIC SERVICE COMMISSION

 Online applications are invited for departmental tests -- May 2020. The candidates who have been applied for Notification No: 03/2020 dated: 01/07/2020 need not to apply for same papers but they have to choose 3 dist center options from 08/10/2020 to 14/10/2020 along with fresh applicants.

DEPARTMENTAL TESTS NOTIFICATION


Tuesday, 22 September 2020

Unit Weight of Materials Used at Construction Site

          We use different material in construction. Each and every material have some unit weight, here in this article we are trying to post some materials unit weights that we use in construction.

S.No

Material

Unit weight (KG/M3)

1

Water

1000

2

Bricks

1600

3

Cement (Ordinary)

1440

4

Cement (Rapid hardening)

1250

5

Cement Mortar

2000

6

Cement Concrete (Plain)

2400

7

Cement Concrete (Reinforced)

2500

8

Glass

2500

9

Lime concrete

1900

10

Cement Plaster

1700

11

Sand (Dry)

1540 to 1600

12

Sand (Wet)

11760 to 2000

13

Steel

7850

14

Stones (Ballast)

1720

15

Stones (Aggregates)

1750

16

Stones (Basalt)

1720

17

Stones (Granite)

2450

18

Stones (Marble)

2650

19

Timber (Oak, Sal)

510

20

Timber (Mango)

650

21

Timber (Teak)

625

22

Coal

600

23

Plastics

1250

24

Ashes

650

25

Clinker

750

26

Rubber

1300

27

Slag

1500

28

Clay Soil

1900

29

Chalk

2100

30

Lime Plaster

1700